Skip to main content
Discovery icon for SUPERSYMMETRY Discord server

SUPERSYMMETRY

3,065 Online
7,147 Members
# susy-general3 people

AE2 power requirements

Applied Energistics 2 (AE2) now requires 512 times more power, making it viable mostly from Medium Voltage (MV) onwards, though a basic system can be powered at Low Voltage (LV).

  • AE2 now demands significantly more power, making it a late game or early MV tech for most players, rather than an early LV option.
  • While before the update a single LV steam turbine could power basic AE2, it now requires power equivalent to 16 amps of High Voltage (HV) for a fully functional system.
  • A basic AE2 system with two drives, a crafting terminal, and an energy cell to handle spikes consumes about 7.5 HV amps, which can be supplied by 8 LV steam turbines.
  • Power routing at LV would be challenging for AE2, suggesting MV is a more practical tier for its implementation.
Summarized from recent messages, might be inaccurate

More conversations

Talk, Play, &
Hang Out

Find your space to hang out, discuss the latest updates with the party chat, and see who's down to join your next match.
Get App